Simpler Workflows

Business optimization studio

Untangle
the work.

We find where work gets expensive and build a better way to do it. Your team keeps the tools.

Explore the work

Selected work

See a problem through.

Three Demonstrations
Explore the decisions and evidence behind each one.

Product & research

Support tickets tripled.
One issue stood out.

After a software release, weekly tickets jumped from 60 to 180. Comparing the reports by issue revealed where the product team should look first.

6 → 102

Stuck CSV exports before and after the release. They account for 96 of the 120 additional reports.

The handoff A categorized ticket file and a short list for engineering. Ticket volume identifies the symptom. Reproducing it is the next step.

Listen to the finding

Support tickets tripled after the release. Look at where the increase came from. Stuck exports accounted for 96 of the 120 extra reports. That’s where I’d start.

View ticket evidence 240 sample tickets

Of the 60 tickets before release 4.9, 6 concerned stuck CSV exports. The following week, 102 of 180 tickets concerned exports.

Commercial operations

A near match can
cost you the bid.

A distributor has 24 line items to quote. One pump meets the requested flow and pressure, but runs on the wrong voltage. The bid sheet brings that exception to the estimator.

Bid desk / catalog comparison

24 lines
to quote.

16 match · 5 need review · 3 unmatched

Inspect a bid line

RFQ-017 / CP-200

230 V requested.
460 V listed.

The flow and head agree, but the listed pump requires a different electrical supply. Hold this line for technical review.

The handoff A bid sheet with a reason beside each decision. The sales team can quote the matching lines and send the exceptions to the right people.

Listen to the finding

This pump looks like a match. Then you check the voltage. The buyer needs 230 volts. The pump takes 460. Flag that before the quote goes out.

View the bid sheet 24 sample lines

Sixteen lines match the catalog. Five need review for specification, material, connection, quantity or delivery. Three have no listed match.

Finance & delivery

The total hid the
most expensive job.

Three electrical jobs were $12,000 over plan together. Juniper Library alone was $15,000 over. Savings on the other jobs softened the figure that reached the owner.

Watch the 12-second breakdown
Electrical plans and a red drafting pencil on a workbench.

Weekly cost review

+$15,000

Juniper Library over plan

The handoff A reusable weekly comparison that points the project manager to the job that needs a closer look.

How we work

Start with
the real job.

We start with the people doing the work and a recent example. Seeing how one quote, report or request actually moves tells us where a change would be worth the effort.

Then we agree on a result, build it against representative cases, and hand over the working files with instructions. Your team can run the next one.

Discuss a project

Project inquiry

Tell us about
the work.

Think of a recent quote, report or handoff. Where did someone have to stop, check or do the work twice?

hello@simplerworkflows.studio